Rural Piped Water Supply Scheme at Village Nirmalpura, Nalanda in Bihar (A)
Dutta, Goutam Case IIMA-PROD0327(A) / Published March 22, 2021 / 19 pages. Collection: Indian Institute of Management, Ahmedabad
Format Price Quantity Select
PDF Download
$6.95
Printed Black & White Copy
$7.25

Product Overview

This case deals with a project on establishing a rural piped water supply scheme in a village of Bihar. The Joint Chief Engineer, Public Health Division, Patna, Bihar, wanted to have a meeting to discuss his project. His team consisted of the village head, the Joint Chief Engineer (JEC) or Superintending Engineer (SE), Deputy Chief Engineer (DCE), Executive Engineer (EE), Assistant Engineer and the main contractor. The whole project is divided into project, activities and sub-activities. This concept is called hierarchical decomposition of work or work breakdown structure level -3 (WBS-L3). This concept was explained to all members present in the meeting.




  • Videos List

  • Overview

    This case deals with a project on establishing a rural piped water supply scheme in a village of Bihar. The Joint Chief Engineer, Public Health Division, Patna, Bihar, wanted to have a meeting to discuss his project. His team consisted of the village head, the Joint Chief Engineer (JEC) or Superintending Engineer (SE), Deputy Chief Engineer (DCE), Executive Engineer (EE), Assistant Engineer and the main contractor. The whole project is divided into project, activities and sub-activities. This concept is called hierarchical decomposition of work or work breakdown structure level -3 (WBS-L3). This concept was explained to all members present in the meeting.

  • Learning Objectives